Commit Graph

9999 Commits

Author SHA1 Message Date
Budiarto Herman
7c0d6d1255 Moved LteHelper::Connect functionality into LteHelper::Attach 2013-08-02 14:38:56 +03:00
Budiarto Herman
3ad66df568 Separated RSRP and RSRQ calculation in LteUePhy 2013-07-31 23:28:46 +03:00
Budiarto Herman
e46947d777 Renamed some variables in LteUePhy 2013-07-31 21:24:45 +03:00
Budiarto Herman
f6cd092201 Renamed some UE measurements variables 2013-07-31 16:07:30 +03:00
Budiarto Herman
45cba68616 Updated documentation for LteHelper::Attach function family 2013-07-31 14:28:06 +03:00
Budiarto Herman
6d4c290170 Renamed LTE measurement mapping function for consistency 2013-07-31 13:50:46 +03:00
Budiarto Herman
abe882ea95 Testing documentation for LTE cell selection 2013-07-30 16:41:23 +03:00
Budiarto Herman
dfe28a253f Updated the structure of initial cell selection documentation 2013-07-29 18:24:32 +03:00
Budiarto Herman
9100b307dc SIB2 trace source 2013-07-29 18:23:56 +03:00
Budiarto Herman
6db0fffd14 Removed PLMN from LTE cell selection criteria 2013-07-29 11:38:13 +03:00
Budiarto Herman
dc3ef42bbd Evaluation of cell selection criteria 2013-07-28 08:28:07 +03:00
Budiarto Herman
697755b1fe Updated UE measurements and initial cell selection documentation 2013-07-28 08:17:35 +03:00
Budiarto Herman
b4c068cfbb Fixed lte-x2-handover-measures test suite by increasing the rate of measurement reports 2013-07-24 18:02:08 +03:00
Budiarto Herman
3439967223 Using ObjectFactory in LteHelper for LteUeNetDevice 2013-07-22 20:41:34 +03:00
Budiarto Herman
a3eadefe4b Generic (not eNodeB-specific) helper functions Attach and Connect 2013-07-22 12:39:11 +03:00
Budiarto Herman
880a48f0b9 Moved several cell selection functionality from UE PHY to RRC 2013-07-22 11:20:27 +03:00
Budiarto Herman
a7327aa9f0 Reverted position of SetChannel in LteHelper InstallDevice functions 2013-07-22 11:19:31 +03:00
Budiarto Herman
cdffe69512 Merged an obsolete branch 2013-07-19 14:34:25 +03:00
Budiarto Herman
3294c71024 Reverted changes from parent revision 9974 2013-07-19 14:32:12 +03:00
Budiarto Herman
6592bc8f58 Several fixed to LTE initial cell selection 2013-07-19 14:23:04 +03:00
Budiarto Herman
0b7929d6b4 Few updates to documentation 2013-07-19 12:49:02 +03:00
Budiarto Herman
eddab79fdb DL EARFCN attribute for UE 2013-07-17 15:12:01 +03:00
Budiarto Herman
c1adaa985d Attempt to initial synchronization, cell search, MIB and SIB1 2013-07-16 09:43:01 +03:00
Budiarto Herman
9f0ba0f883 Attempt to shift MIB closer to Idle mode 2013-07-10 19:17:00 +03:00
Budiarto Herman
f25ecbfd4e Updated UE measurements documentation 2013-07-10 14:59:00 +03:00
Budiarto Herman
a604e2d91f UE measurements fixes and tests for reportOnLeave and haveMeasResultNeighCells 2013-07-09 21:35:43 +03:00
Budiarto Herman
03b293375a Time-to-trigger implementation and tests for Event A3, A4, and A5 2013-07-09 17:31:04 +03:00
Budiarto Herman
2ffc089b6f UE measurements time-to-trigger tests for Event A1 and A2 2013-07-09 14:55:30 +03:00
Budiarto Herman
5f541bc22f Fixed UE measurements timing issue (when reportInterval > 200 ms, or when time-to-trigger < 200 ms) 2013-07-09 14:53:20 +03:00
Budiarto Herman
7553c905c7 Time-to-trigger implementation and tests for Event A1 2013-07-08 23:11:37 +03:00
Budiarto Herman
4051839d03 Recombined UE measurements tests into one file 2013-07-06 15:14:33 +03:00
Budiarto Herman
bd435c4fc7 Refactoring LteUeRrc 2013-07-04 20:46:20 +03:00
Budiarto Herman
9c67c38609 Fixed a bug in UE measurements test 2013-07-04 20:28:30 +03:00
Budiarto Herman
585b1ced9e Removed BuildMeasConfig from .h (already removed from .cc before) 2013-07-04 14:22:42 +03:00
Budiarto Herman
aca9b556d5 Reduced UE measurements test execution length 2013-07-03 18:18:59 +03:00
Budiarto Herman
63809ba7b9 Added hysteresis tests to UE measurements test suites 2013-07-03 17:30:10 +03:00
Budiarto Herman
7ae10a085b Clarification comments on LTE SI transmission schedule 2013-07-03 15:40:08 +03:00
Budiarto Herman
dd59b7acb3 Additional tests for UE measurements handover test suite 2013-07-03 15:10:08 +03:00
Budiarto Herman
a0b74cea40 Split UE measurements tests into multiple test suites (still problem with operator redefinition) 2013-07-03 14:09:58 +03:00
Budiarto Herman
8a8559d63c Changes based on peer review: typos in documentation, conversion functions for Hysteresis and a3-Offset, separated constructor implementation of ReportConfigEutra, and removed dead code in LteUeRrc. 2013-07-02 22:18:03 +03:00
Budiarto Herman
dbe5bad5bd Fixed Event A5 bug 2013-07-02 21:34:14 +03:00
Budiarto Herman
7f81232309 Preliminary design and user documentation of LTE initial cell selection 2013-07-02 10:23:16 +03:00
Budiarto Herman
46b47877e5 Preliminary UE measurements handover test case 2013-06-28 12:31:30 +03:00
Budiarto Herman
6f4d7a2990 A few fixes to UE measurements test cases 2013-06-28 10:24:33 +03:00
Budiarto Herman
9ef9da1519 Event A5 implementation and test cases 2013-06-27 13:23:02 +03:00
Budiarto Herman
4e208dae3c Fixed conversion of A3 offset 2013-06-27 10:08:32 +03:00
Budiarto Herman
e0d555f72f UE measurements piecewise test case 2 2013-06-26 17:01:46 +03:00
Budiarto Herman
6883144780 Constructor for ReportConfigEutra 2013-06-25 17:54:49 +03:00
Budiarto Herman
0948488e79 Fixed typo 2013-06-25 17:06:16 +03:00
Budiarto Herman
b9a1aefc2b UE measurements test case for Event A3 and A4 2013-06-25 14:43:12 +03:00