Commit Graph

35 Commits

Author SHA1 Message Date
Piotr Gawlowicz
a9ef49d196 GSoC 2014 FFR algorithms 2014-09-05 01:12:55 +02:00
Nicola Baldo
2adafe2e40 merge lena-dev with ns-3-dev 2013-05-14 13:29:16 +02:00
Nicola Baldo
6a67bed074 added reference octave script for lte-x2-handover-measures test 2013-05-08 18:45:16 +02:00
Marco Miozzo
a21e1e18ae Bug-fix in UE measurements: introduce a factor of 2 in RSSI evaluation for considering all the power of RS over the symbol 2013-04-05 12:26:57 +02:00
Nicola Baldo
c9db3544f0 updated figure generation in lte_ue_measurements.m 2013-04-04 18:50:19 +02:00
Marco Miozzo
73ae780748 Bug-fix RSRP/RSRQ measurements: moved to RE basis and update test accordingly 2013-04-04 16:53:48 +02:00
Nicola Baldo
9f271d4aad revised lte ue measurement octave script 2013-04-04 13:40:56 +02:00
Marco Miozzo
ee6d9ad3c6 Update test-vector for lte-ue-measurements: tests passes 2013-03-06 18:09:54 +01:00
Marco Miozzo
34ef42a780 Add TestSuite for UE Measurements: on-going work, test does not pass 2013-03-06 11:58:54 +01:00
Jonathan McCrohan
2416ba0ba2 bug 1507: typo: s/bandwdith/bandwidth/g 2012-10-07 07:26:08 -07:00
mmiozzo
b782c858b5 Update test suite lte-phy-error-model with a CI of 99.9 percent 2012-07-11 16:19:21 +02:00
mmiozzo
6485dbb1c1 Update PEM model with new BLER curves based on standard ECR 2012-05-22 16:40:24 +02:00
Nicola Baldo
8257ff1d54 correct light speed in ITU-R porpagation models 2012-05-07 13:52:32 +02:00
Nicola Baldo
4e3bd53d7f moved reference propagation scripts 2012-05-07 11:54:24 +02:00
Marco Miozzo
d373beccf4 Update PEM doc with test section and annex with MCSs BLER figures 2012-01-12 15:45:23 +01:00
Marco Miozzo
f8c09cf2b2 Bugfix on lte_pathloss-m: adjust reference values according to new frequency 2011-10-27 10:27:36 +02:00
mmiozzo
6de4f3c92f Update pathloss test with new frequency definition in helper 2011-09-16 16:50:42 +02:00
Marco Miozzo
f8143c17e7 BuildingPathlossModel system test finalized and passed 2011-07-27 11:22:20 +02:00
Marco Miozzo
60163c70b3 Finalized pathloss model compound test: passed 2011-07-21 13:51:02 +02:00
Marco Miozzo
22088aeda8 Basic compound test implemented (single pathloss models, no combination) 2011-07-20 15:24:41 +02:00
Marco Miozzo
5b18485c70 Debug and verification of pathloss models COST231, ITU1411 LOS, ITU1411 NLOS over rooftop 2011-07-19 13:29:35 +02:00
Marco Miozzo
5fa075585a Add octave reference values computation 2011-07-18 13:45:20 +02:00
Nicola Baldo
a3c3fab40a interference test finalized and passing 2011-06-04 02:43:35 +02:00
Nicola Baldo
c9d80cd463 draft interference test 2011-06-03 20:27:11 +02:00
mrequena
d02a7090e6 mcs index figure 2011-05-20 14:18:35 +02:00
mrequena
f9ed2d9c59 script for link adaptation test 2011-05-19 18:30:00 +02:00
mrequena
a8e63a6c27 add octave script of the SINR calculation tests 2011-05-19 16:36:53 +02:00
Nicola Baldo
fd1288b7b3 comment style from '#' to '%' for the octave scripts in src/lte/test/reference 2011-05-17 10:32:46 +02:00
Nicola Baldo
4649d2fe02 updated lte-spectrum-value-helper test according to new tx psd calculation 2011-05-12 15:53:04 +02:00
Nicola Baldo
e6e8ad4153 added reference scripts for lte-spectrum-value-helper test 2011-05-12 15:42:20 +02:00
Nicola Baldo
449b29dab8 updated lte link budget reference 2011-05-12 15:35:11 +02:00
Nicola Baldo
f38a87e2ff new test vector for AMC test; some test cases passing, but not all 2011-05-11 19:30:01 +02:00
Nicola Baldo
1a207eb3ce added reference script for AMC test 2011-05-11 12:08:36 +02:00
Nicola Baldo
17f6831e65 added missing script 2011-05-06 18:44:48 +02:00
Nicola Baldo
5e9a03086c added reference script for link budget calculation 2011-05-06 14:34:47 +02:00